The following cameos cover some very successful projects completed by Premier Substructures recently.

THE LONDON TAXI COMPANY

Duration on Site:
15 days

Substructure Size:
1no. 75m (L) x 4m (W) x 1.3m (D)
2no. 8m (L) x 4m (W) x 2m (D)

WITHAM GYM, LOVELLS

Duration on Site:
8 days

Substructure Size:
T Shaped 10m (L) x 3m (W) x 1.5m (D)

NORTHFIELD CONSTRUCTION

Duration on Site:
5 days

Substructure Size:
8m (L) x 3.5m (W) x 6.8m (D)

HEATHROW AIRPORT

Duration on Site:
20 days

Substructure Size:
15no. 4m (L) x 2m (W) x 2m (D)

FLOORSPAN

Duration on Site:
5 days

Substructure Size:
8m (L) x 3.5m (W) x 6.8m (D)

TAMWORTH GYM CLUB

Duration on-site:
5 days

Substructure size:
(L-shape)4.3m (W) x 10m (L) x 1.5m (D)

WIDE LANE

Duration on site:
10 days

Substructure size:
5no. Varying